Case study · Leucadia Wastewater District

Batiquitos Force Main Leucadia Wastewater District.

About 8,530 linear feet each of 14-inch secondary effluent force main and 24-inch sewer force main, in a joint trench.

Project
Batiquitos (B1/B2) Force Main Replacement
Client
Leucadia Wastewater District
Project type
Sewer Force Main
8,530 LF14" secondary effluent force main
8,530 LF24" sewer force main, same trench
383 LFCIPP in an existing 21" gravity sewer
2 ftThick concrete roadway cut and replaced
The work

Burtech Pipeline furnished all labor, materials, equipment, tools, transportation and services for the Batiquitos Force Main Replacement Project: approximately 8,530 linear feet of 14-inch secondary effluent force main and approximately 8,530 linear feet of 24-inch sewer force main in a joint trench, replacing the existing mains.

The project also included about 383 linear feet of cured-in-place pipe in an existing 21-inch gravity sewer main (with an additional trucked bypass to line it), a 5-foot discharge manhole, isolation valves, and four air vacuum air release valves and four blow-off valves in new 4-foot manholes.

Our scope covered saw cutting and removal of concrete roadway up to two feet thick, potholing, trenching, shoring, dewatering, bedding, compaction and backfill; the Storm Water Pollution Prevention Plan and the Mitigation, Monitoring and Reporting Plan; abandonment or removal of the existing mains; corrosion protection; permits; traffic control; and trench resurfacing and site restoration back to original conditions.

Crew and an equipment trailer on a street job

Photo from the company’s case-study page.

  • License #718202 · Class A General Engineering
  • C36 plumbing license
  • Family owned since 1994
  • 200+ public & private projects
How a job runs

From bid to restoration.

Teamwork, effective communication and hard work, so jobs are completed accurately, on time and within budget.

Request a bid
  1. 01

    Bid & estimate

    Send the plans and bid documents. Our estimating team prices the underground scope.

  2. 02

    Plan & permit

    Potholing of existing utilities, permits, traffic control and storm water pollution prevention plans.

  3. 03

    Build

    Trenching, shoring, dewatering, pipe, bedding and backfill, with bypass systems to keep service running.

  4. 04

    Restore & close out

    Connections to the existing system, trench resurfacing and site restoration, on time and within budget.

Get in touch

Planning a similar pipeline project?

Sewer, water, storm drain and CIPP lining, in public and private works. Office hours Monday–Friday, 6am to 4pm.

Work with Burtech Pipeline

Have an underground project?

Call the office in Vista, Monday to Friday from 6am to 4pm, or send us a message. Wherever and whenever you need us, we are available to complete the job.